Minibus Bus Condition Installation and Commissioning

Adjusting operating parameters such as pressure, temperature, and ventilation volume ensures the system operates at its most economical and efficient state. This includes ensuring good sealing of the Minibus Bus Condition under high pressure.

Automatic Control and Protection Component Setting
The automatic control and protection components of the Minibus Bus Condition need to be set to ensure safe and reliable system operation. This includes checking the sensitivity and reliability of safety protection devices and verifying the proper functioning of temperature and electrical control components.

Performance Testing
Before installation, a ground test is typically conducted on the air conditioning unit and control cabinet to check their functionality. After installation, comprehensive performance testing may be required to ensure the unit meets design standards.

Precautions
During commissioning, relevant procedures must be strictly followed to ensure installation quality. The system must be clean, free of moisture, other gases, and impurities. Simultaneously, ensure the voltage and capacity of the power supply lines meet requirements.

Minibus Bus Condition midibus

The commissioning time after installing the Minibus Bus Condition depends on the specific commissioning stage and purpose, typically ranging from 30 minutes to 4 hours.

Basic Function Testing Stage
After initial power-on, Bus Condition should run continuously for at least 30 minutes to detect and record key parameters such as voltage, refrigerant pressure, and fan speed.
System Stability Verification Stage
The trial run should last at least 2 hours, primarily observing for abnormalities such as frequent on/off cycles or temperature fluctuations.
Commissioning in Special Environments
In summer, it is recommended to run in cooling mode for at least 4 hours, focusing on checking the drainage pipes for blockages and ensuring normal condensate flow.
In winter, wait 8-15 minutes after starting the vehicle until the engine coolant temperature reaches the normal range before turning on the heating function.

After the Minibus Bus Condition commissioning is complete, record parameters such as temperature and pressure, and experience the operational effects (e.g., temperature stability, noise levels).
For new vehicles or newly installed air conditioning systems, it is recommended to regularly check pipe pressure and refrigerant levels.